Skip to content
Service

Roofing

Tile and slate re-roofs, warm-deck flat roofs in GRP, EPDM or felt, plus leadwork, fascias, soffits and gutters. Scaffolding, stripping, felting, battening and covering all handled by our own team.

Typically from
£6,500
Duration
1–3 weeks

What’s included

Every quote is itemised line by line. Here is what a typical job covers.

  • Scaffold design, erection and removal
  • Strip, dispose and inspect roof timbers
  • Breathable membrane and treated battens
  • Tiling or slating with ridge and verge detail
  • Lead flashings, valleys and abutments
  • UPVC fascias, soffits and rainwater goods
  • Tile, slate and flat roof systems
  • Leadwork, valleys and chimney flashing
  • Fascias, soffits and guttering
Finished slate roof with ridge tiles and gutters
Treated battens laid across a breathable roof membrane
Stepped lead flashing between a chimney and slate roof
How it works

Five steps, no surprises.

You always know what happens next, what it costs, and who is turning up.

  1. 01
    Same day

    Conversation

    Message us on WhatsApp with a few photos and a rough idea. We will tell you straight away whether it is something we do, and roughly what range you are in — before anyone visits.

  2. 02
    By arrangement

    Site survey

    We come out, measure properly, look at the things that cost money — access, drains, ground, structure — and talk through what is realistic for your budget and timescale.

  3. 03
    After the survey

    Fixed written quote

    An itemised quotation with the specification, the stage payment schedule and a start date. No day rates, no vague provisional sums, no pressure to sign on the spot.

  4. 04
    To programme

    Build

    One named contact for the whole job. Clean site, agreed hours, weekly photo updates, and every trade directly employed or long-standing — not whoever was free that week.

  5. 05
    On completion

    Sign-off & aftercare

    We walk the job with you, clear the snag list before the final payment, hand over certificates and guarantees, and stand behind the work for two years.

Good to know

Roofing questions

If the battens and felt are sound and the failure is localised, repair is the right call and we will say so. Once the felt has perished along the eaves or the nails have corroded through, patching only moves the leak — at that point a re-roof is the cheaper decision over ten years.

Ready to price your roofing?

Send a couple of photos and rough measurements on WhatsApp. We will come back the same day with an honest range.

Prefer to talk? +40 725 973 665